Auditorium: An existing campus coming up with a new building of Auditorium cum Library having a total built-up area of about 2,00,000 SF. The building has lecture theatres, Large size Auditorium and a library block. The system designed and applied in a central chilled water plan with meeting all ECBC 2017 norms and thus achieve energy efficiency.
Hostel Block: New girls hostel with over 150 room provided with central air conditioning. The hot water is achieved through waste heat from the condensing unit of Outdoor units as pre-heated water to the heat pump.
Scope: MEP Design